top of page

Complete renovation

  • Purple splash back with mirror on basin and bath wall. 

  • Leak under bath caused old chipboard floor to expand, weaken and sag, breaking bath seal and causing more water damage.

  • Leak on basin dropped vanity unit slightly and spread underneath cork floor tiles making chipboard floor weaken and warp beyond repair. 

 

Video Name

I'm a description. Click to edit me

  • All walls stripped back to plaster

  • Flooring removed, stregnthened where needed and replaced

  • Pipework replaced and tested before floor replaced

Finished Product

  • Vertical Bristan square bar shower

  • Quarter turn bath taps with chrome pop up waste

  • Whirlpool Shower bath 

  • Back to the wall pan with matching soft close seat

  • Concealed cistern with duel push button flush

  • Access to cistern through removable worktop

  • Shower pump under bath panel

  • Electric 300x1600 oil filled towel radiator with thermostatic temperature control

  • Purpose design&fitted worktop and shelving for basin vanity unit by ShaunTaylorBathrooms

  • White ceramic wall and floor tiles with matching grout lines throughout

bottom of page