Bathroom Extension and rebuild




-
badly designed bathroom with huge framed basin that takes up most of the room with no storage,
-
pointless cupboard door to side of entrance that can only hold toilet rolls



-
moved entrance to side wall and removed pointless cupboard and extended wall into study to add space for shower cubical
-
Boarded, insulated and plastered old door wall ready for decorating
Finished Product




-
Duel Fuel (Electric and water heating) thermostatic chrome towel rail
-
Chrome square concealed shower valve with wall mounted rain head and flexible handheld single fixed outlet
-
Single door low level quadrant shower tray and screen
-
Back to the wall close coupling comfort height short projection wc
-
Double end shelved bath with hand shower bath filler
-
White wall mounted double drawer unit with hexagon lighted mirror
-
Replastered ceiling
-
Floor treated and strengthened from woodworm damage
-
White 600x300 marble effect porcelain wall tiles, Grey 600x600 porcelain floor tiles
-
All plastering, joinery, tiling, plumbing and building work done by Shaun Taylor Bathrooms, electrical work by Nick O'Malley